<> Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For – Lifestyle Haven
-61%

Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy

$45.00 $17.99

Shipping calculated at checkout.

 Description: LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged...

Color: Black

  • Black
  • Green
  • Red
  • Blue
  • Pink
  • Fruit-green

Size: S 1.5m

  • S 1.5m
  • XS 1.2m
  • L 3m
  • M 1.8m
  • XL 4.5m
  • 2XL 6m
  • 3XL 10m
Out of stock

amazon paymentsamerican expressapple paybitcoindankort
SKU: 42288796-black-s-1-5mN/ACategories: All Products, SaleTags: Shopify Collective, Stevvex

 Description:

  • LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background
  • GREAT DESIGN- The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off
  • LONG DOG LEAD-  Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs

Brand Name: STEVVEX Pets
Model Number: ST12DB786GBI

Type: Leashes
Dog Leash Type: Basic Leashes
Material: Nylon
Type: Dogs
Season: All seasons
Pattern: Solid
Feature: Personalized
Feature: outdoor training dog leash rope
Use for: puppy, small medium and large dog belt
Use for 1: training, running dog lead

Color

Black, Green, Red, Blue, Pink, Fruit-green

Size

S 1.5m, XS 1.2m, L 3m, M 1.8m, XL 4.5m, 2XL 6m, 3XL 10m

Sunday,Monday,Tuesday,Wednesday,Thursday,Friday,Saturday
January,February,March,April,May,June,July,August,September,October,November,December
Not enough items available. Only [max] left.
Add to WishlistBrowse WishlistRemove Wishlist
Shopping cart

Your cart is empty.

Return To Shop

Add Order Note Edit Order Note
Estimate Shipping
Add A Coupon

Estimate Shipping

Add A Coupon

Coupon code will work on checkout page

Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy

Black / S 1.5m
Black / S 1.5m
$45.00 $17.99
Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy | Lifestyle Haven